Executive summary first: what needs a decision, what changed, and what evidence supports it. Open the engineering workspace only when you need the source-level proof.

Representative modern medical centre architecture
Representative image
Thu Duc Medical Centre Expansion Healthcare · HCMC
Engineer decision required Rev B · Construction Docs
Decision now

Construction-document freeze requires senior fire/mechanical judgement on smoke-control and egress interfaces.

8 open findings 3 human decisions 72% evidence ready
What changed

Egress re-route — Level 3

Evidence pressure

Mechanical is the least complete discipline at 64%.

Machine boundary

3 item(s) require competent-engineer judgement; the machine does not close them.

Evidence-linked findings

What the reviewer should inspect first

Next actions

Who moves the review forward

Resolve smoke-control zoning basis for TDM-041 Fire + Mechanical · due 2026-08-09
Reconcile Level 3 protected-door schedule with current egress plan Architecture · due 2026-08-10
Source pack 4 tracked documents
Healthcare Fire Strategy Rev D Rev DM-510 Smoke Control Rev B Rev BA-303 Level 3 Plan Rev B Rev BDoor Schedule Rev A Rev A